Ha Noi: Adjusting the Master Plan for Low-Income Housing in Me Linh

(Construction) – The People’s Committee of Hanoi has just issued Decision No. 1739 / QD-UBND approving the overall plan of the detailed planning of 1/500 scale housing area for low income people in Tien Phong commune. , Me Linh District, Hanoi.

According to the decision, the area of ​​the study area was adjusted to 16.7 hectares, of which zone I 2ha; Zone II 14.7ha. The population is about 4,577 people (Area I: 1,678 people, Zone II: 2,899 people).

Particularly, Zone I: Public land covers an area of ​​about 4.095m2, accounting for 20.2% of the land area of ​​Zone I, including 01 land plot with the CCKV sign; Mixed land covers an area of ​​about 12,709m2, accounting for 62.6% of land area I, including 01 plot of land with the symbol HH; Roads of urban roads and areas of the main urban roads and main roads in the area of ​​about 3,492m2, accounting for about 17.2% of the area of ​​Area I.

Zone II: Roads of regional roads include main roads and regional roads with the total area of ​​19.559m2, accounting for about 13.3% of the land area II; Secondary school land covers an area of ​​8.302m2, accounting for 5.6% of the land area and land II, including 01 plot of land with the symbol TH-01; The pre-school land area is about 5,062m2, accounting for 3.4% of the land area II, including 01 plot of land with the symbol TH-02; Land of green trees, physical training and sports in the area of ​​about 14,147m2, accounting for about 9.6% of the land area II, including 02 cells with the symbol CX-01; CX-02; Residential land area of ​​about 76.404m2, accounting for about 51.8% of the land area II; Parking land area of ​​about 2.025m2, accounting for about 1.4% of land area II.

The Hanoi People’s Committee assigns the Director of the Department of Planning and Architecture to inspect and certify the drawings, regulations on management according to the project. To adjust the master plan of 1: 500 scale in conformity with the Decision This determination.

The Me Linh District People’s Committee is in charge of coordinating with the Department of Planning and Architecture and the Vietnam Construction Investment and Design Joint Stock Company to publicly announce the contents of the detailed plan of the detailed planning scale 1 / 500 approved organizations, agencies and people know, implement, archive project files as prescribed.

Surprise space in the roof house between Bien Hoa city

The large yard of nearly 600 square meters with wells, greenery turns the building into a peaceful world in the middle of the street.

On the old land of the family, Phong (Bien Hoa City, Dong Nai) wants to rebuild the house in childhood memories. He used to live in a roofed house with a well, with his mother planted with foliage knit under the porch.

The architects helped Mr. Phong to rebuild the new two storey house reminiscent of old homes many remember. The house is full of facilities but still in harmony with nature thanks to the green garden, inner courtyard, wells, lakes …

On the land of 800 m2, the owner only build more than 200 m2, spend most of the outdoor space.

The soft curved corridor embraces the green courtyard with water and bonsai trees.

The house inherits the folk architecture with wide leaves, leaves under the roof.

The rooms are shielded by skylights and lumber systems. The wall covered two layers, the middle is covered with foam insulation.

The works evoke images that are both familiar and modern, both modern and folk. The house as a suggestion for the inheritance of core architectural values ​​from the countryside.

Each room has at least two sides of natural contact, creating a pleasant cool feeling.

Floral floor tiles arranged random tone, bedhead using wood or wood door shutters make the bedroom feel close, familiar.

The log system runs along the corridor, creating a southwesterly sunblind surface. Architects use modern technologies such as solar panels and irrigation systems to irrigate indoors.

The project was designed by architects Hoang Thuc Hao, Nguyen Van Tuan, Nguyen Trong Duc, Vu Xuan Son, Nguyen Binh Minh, Nguyen Anna Ngoc (Office 1 + 1> 2) and Toko Studio.

Recommend the Prime Minister to keep the status quo Son Tra Peninsula

(Construction) – On March 21, the Da Nang Tourism Association has written to Prime Minister Nguyen Xuan Phuc to review the Master Plan of Son Tra National Park in Da Nang City. Consult with domestic and foreign experts before implementing the master plan.

Recent situation of a corner of Son Tra Peninsula causes public opinion.

Da Nang Tourism Association is concerned about planning the Son Tra Peninsula to become a national tourist resort, which turns Son Tra into a tourist center, Forests, which increase the speed of natural habitat loss, increase the pressure, the ability to look for food and shelter of vulnerable organisms, are prone to extinction.

On the other hand, the construction of many hotel projects by businesses that are not well managed will affect security and defense layout and threaten national defense strategies once these enterprises can move. For foreign partners under the Enterprise Law.

The Association recommends the Prime Minister to keep the status quo Son Tra Peninsula, not to build the accommodation in Son Tra. Only plan Son Tra is a place to visit leisure to preserve the natural landscape with the strict requirements of the treatment of visitors. Minimize the use of motorized traffic to cause noise and pollution. Limiting the implementation of projects on coastal shelf adjacent to Son Tra Mountain increases the risk of coral reef damage, changing currents, destroying the coast, socio-economic impact of the population.

Blue sky, white clouds spread on top Son Tra.

Merging Son Tra Natural Reserve (established under Decision No. 45 / QD-TTg) and the surrounding waters to Nam Hai Van to form the International Biosphere Reserve as the Biosphere Reserve Cu Lao Cham of Hoi An aims to preserve both terrestrial and aquatic ecosystems.

According to Huynh Tan Vinh, chairman of the Da Nang Tourism Association, to build a hotel takes several years, but to have a forest like Son Tra takes hundreds of years. Therefore, the development of tourism on the Son Tra peninsula without careful consideration will affect the development of Da Nang in the future.

The resort project in the Northwest Son Tra Peninsula is located in Tho Quang Ward, Son Tra District, owned by Bien Tien Sa Joint Stock Company and 319 Construction Joint Stock Company. Licensed to cause publicity.

Now Son Tra is crushed because of the resort project villas.

Son Tra peninsula has long been considered as a treasure of Da Nang city. There are biodiversity including: 985 kinds of higher plants (22 species of rare plants), including 800-year-old herbs, 111 species of animals are rich and endemic, including species The red-shanked douc langur is classified in the Vietnam Red Book (2007) and is listed on the World Conservation Union’s list of unconditionally protected animals, which is considered one of the Váci populations. Has the largest number in the natural world, is the conservation symbol of Son Tra.

With an area of ​​4,298ha and natural forest area of ​​2,810ha, especially surrounded by rich and diverse coral reefs of the tropical sea, Son Tra peninsula is very attractive to international diving tourists. . In addition, Son Tra Peninsula is strategically located in the strategic defense of the gateway to Da Nang city, including air, road and waterway and especially has a defensive and radar system. Is the spirit of Indochina, dominating the vast East Sea.

Previously, Son Tra was approved by the Prime Minister as Son Tra Nature Reserve in accordance with the “Decision approving the master plan for biodiversity conservation of the whole country up to 2020 with orientation to 2030” No. 45 / QĐ-TTg dated 08/01/2014. Danang Tourism Association welcomes the investment in infrastructure, entertainment services to increase the attractiveness of visitors to Danang. However, without careful consideration will affect the development of Da Nang city in the future. To build a hotel takes a few years, but to have a forest like Son Tra takes hundreds of years.

Donors want to plan both sides of the Red River as the Qiantang River

Donors want to implement urban planning on both sides of the Red River (Hanoi) as the two cities of the Qiantang River, Hangzhou (China).

By the end of 2016, the Hanoi People’s Committee has agreed to propose three investors organize coordination funding funding planning, invite qualified international consultancy units, experience research planning urban planning The two sides of the river in many countries (Han River – Korea, Huangpu River, Tianjin – China …) involved in the planning of the two banks of the Red River.

At the meeting on reviewing the progress of research and development planning along the Red River, leaders of Hanoi also stated that the views and blueprints along the Red River must be made by many private units. Study design involved in research, to create many options for objectively selective basis. The chosen option must be feasible when implementing construction investment.

After reviewing, donors want to implement the planning of the Red River on both sides of Tien Duong River (Photo: Huu Nghi)

The top priority given to the city is that planning must be the most effective between urban exploitation, creating financial resources for investment in the construction of water management; The dyke and connecting road are connected to old bridges and new bridges are planned to be built; Research to exploit the middle beach, to build green parks along river banks; To work out solutions for planning and projects on dykes in order to make the fullest use of the land areas for urban development, to create capital for investment in construction.

On the basis of being tasked with inviting qualified international consultants with experience in riverine riverine studies, at the end of December 2016, a donor went to Shanghai, Hangzhou (China) ) Study the two sides of the Huangpu River and Qiantang River.

After reviewing, the donor found that the two sides of the Tieng Tang River, Hangzhou City (China) have many similarities with the Red River, Hanoi, Vietnam. Therefore, donors want to implement urban planning along the Red River (Hanoi) as the two cities along the banks of the Qiantang River in Hangzhou.

Therefore, the donor invited the Institute of Planning and Design of Hangzhou City (the unit that participates in the planning design and implementation of projects under the project plan of the two sides of Tien Duong River) to participate in research and development. Planning 1/5000 for urban centers on both sides of the Red River.

On March 1, 1977, the investor and the Hangzhou Institute of Design and Planning (China) worked with the Deputy Minister of Agriculture and Rural Development and the Director of the Department of Agriculture and Rural Development Hanoi to clarify the issues involved.

At the meeting with the Ministry of Agriculture and Rural Development, the Institute of Planning and Planning of Hangzhou City (China) proposed to provide hydrological data, water flow, dike cross section, Surveying, hydro-meteorology … and related documents.

Investors were also instructed by the Ministry of Agriculture and Rural Development to contact the Hanoi People’s Committee to send their official comments in writing to the Ministry of Agriculture and Rural Development and the Ministry of Natural Resources and Environment. Provided the above figures.

Solving the problem of infrastructure for "village in the street"

(Construction) – Many rural areas only after one night has become a ward, city but the infrastructure only meet the requirements of the village. This is one of the challenges of the new rural development project in the process of urbanization today.

Evidence for this from local practice, Vice Chairman of Hanoi People’s Committee Nguyen Van Suu said: “There are still districts plan to sow rice, potato planting. As an urban dweller, he still cares for the crop. “

Hanoi is paying the price because there is a place from commune to ward but the infrastructure is still the village and commune level, not meeting the requirements of people’s life and local economic development. There is still a village street. This shows that the process of building new rural areas associated with urbanization and restructure agricultural production in the locality is still deep.

The same opinion, Vice Chairman of Lam Dong Province People’s Committee Pham S said that this locality is also “awake” when planning development Da Lat when to adjust the planning of the communes will merge into this city To set up the model of “green urban village”.

From this reality, the project of building new rural areas in the process of urbanization in the district level for the period 2017-2020 prepared by the Ministry of Construction is expected to solve these problems in the construction process. Set up new countryside in urban areas.

Accordingly, Deputy Minister of Construction Phan Thi My Linh said that the idea of ​​this project is to build new rural areas in the process of urbanization at district level must be associated with agricultural restructuring, the formation of Large production areas, bringing living conditions to rural people close to living conditions urban residents.

Since then, the project will orient the planning, investment in infrastructure, environment and social services must be in line with the urbanization orientation in order to gradually prepare for the formation of urban areas. Avoid wasteful investment resources.

For example, in Tu Liem district (Ha Noi), after one night, it was a district and a ward, but the road infrastructure was planned and constructed according to the standards of the commune, not meeting the requirements of living, Urban development, must re-invest, cause social waste …

As with Da Lat city, if you build a new countryside in a suburban village and are planning to be in the city then right now, you have to look at what kind of planning is planned, and to preserve cultural identity. Of rural areas, agriculture, and to improve the quality of life services of urban people?

Talking about this issue, Deputy Prime Minister Vuong Dinh Hue said that the project should orient the solution to build new rural associated with urbanization of the period 2016-2020, in which the core is to attach new countryside Urbanization in the district or in the communal administrative units was upgraded to a ward level.

The deputy prime minister requested the Ministry of Construction to further clarify the basis for developing the proposal based on Party resolutions, the Party congress document on new rural construction, agricultural restructuring, With the national and local socio-economic master plans, urban development strategies and urban development planning, the framework of the national target program on building new rural areas in 2016- 2020 and the main ideas of the Bill of Planning Law that the Government prepares to submit to the National Assembly for discussion.

For the purpose of the scheme, Deputy Prime Minister said that the vision of building a new countryside in the direction of harmonious urbanization, linking economic and social fields, preserving cultural identity rather than Create a new rural pattern only.

From that point of view, the Deputy PM suggested ministries and sectors to define the framework for development planning for new rural areas in the urbanization process at the district level or in the communes to be transformed into urban areas; Set a reasonable percentage of communes and districts planned in this direction.

The implementation of the scheme will be in line with market principles, mobilizing resources from people and local budgets, promoting the initiative and creativity of each locality in the planning and implementation plan.

Beautiful roof garden like a small park in Hanoi

Between the green grass is the living room, dining table, swing, nestled between the flowering beds and the fish swimming under the lake.

Right from the design of the house, Quang (Hai Ba Trung, Hanoi) has planned to make a garden of flowers, plants and ornamental fish on the roof. Total terrace area is 200 m2.

After the rough construction of the building was completed by the end of 2014, the architects of Tung Lam Garden began to participate in the process of garden design. Picture of the entrance from the door to the terrace.

The materials, soil, trees are transported to the 10th floor by crane. Construction crews must work overnight.

In addition to the time of adverse construction, architects also have to solve many other difficulties to have beautiful orchards. The garden on the 10th floor has strong winds, behind the house is the harsh west. Therefore, the selected trees are able to adapt well to unfavorable weather conditions. After 3 years, the trees and flowers are green, blossoming.

Garden gardens not only plant trees, but simply fish that are planned into a closed space. The automatic irrigation system is arranged to facilitate the owner, providing moderate humidity to the plant.

In the middle of the garden is a guest house, chatting in the cold or sunshine, sunbathing area … Surrounding the common living area is a glass that maximizes the view of the host and guests.

The exterior of the building is the waterway that brings the vibrancy of the tranquil garden space, and helps cool down the summer days. The designer carefully calculated to ensure the requirements for roof waterproofing, drainage well with specialized materials.

Selected plants include both native and exotic species but are well adapted to the new environment. The soil is carefully mixed to provide long lasting nutrients to the plant so that less fertilizer is applied.

Homeowners can organize outdoor parties for family and friends to play. Table and furniture materials are carefully selected to ensure durability in the weather conditions of heavy rain in Hanoi.

Kitchen cabinets, cooking, dishwasher convenient and airy when placed adjacent to the table table.

The tea sitting area, beautiful views overlooking Lake Ba Mau, Thong Nhat Park.

The harsh weather conditions in Hanoi make it difficult to raise koi (Japanese carp) on the terrace. However, the landlord has a good source of fish, proper care and nourishment. Over the hot and cold seasons, the host can watch the fish swim in the 50 cm range.

Nice house renovated from grade 4 in Ho Chi Minh City

From the old 4th grader in an alley in Thu Duc district (HCMC), the architect chose the renovation plan required by the investor instead of damming the new one.

This unique 3-storey house was renovated from a 4-story house on 50 m2.

The architect has put on the old house a new look suitable for three new owners of the house, the young dynamic, preferring the style moves.

According to the owner, because the house is open in many directions, located in a quiet alley, they decided to buy and fix.

The main materials used in the house are pressed wood and steel with yellow-white tones.

The owner and architect agreed not to use costly materials to reduce the cost of the building.

The main living room uses a prominent triangle table, avoiding the boring feeling in the white space.

Kitchen and dining table with living room is a popular trend in the apartments to create a spacious space with open feeling.

Instead of using fancy closets, the kitchen uses two simple logs.

The master bedroom of the house with large windows takes the wind and light. Architects have deftly utilized roofing sheets made of natural materials to bring aesthetics to the room and cut back on renovation costs.

Each bedroom in the house has a small desk for the needs of the room owner.

The piano stands out from the main bedroom connecting the master bedroom with the garden outside the balcony.

3rd floor auxiliary works for main bedroom.

This sub-structure is designed according to the 5 star hotel standards. The use of white tones makes the whole house look larger than the 50 square meter area.

The first and second floors of the house are connected by straight stairs, while the third floor is connected by a twisted staircase.

Two additional bedrooms on the second floor share an extra building.

Each bedroom has its own color tone.

According to Ngo Minh (Photo: Quang Tran) /Zing.vn

Hanoi has not agreed to any investors planning the two sides of the Red River

(Construction) – This is confirmed by Mr. Pham Quy Tien, Chief of Office of Hanoi People’s Committee at the press conference held by the Hanoi Party Committee and Propaganda Department on 21/3 pm.

According to Mr. Tien, March 20, Hanoi People’s Committee received information that a number of press agencies have posted the article “Hanoi People’s Committee has requested the relevant units to provide documents, documents Data for the Institute of Planning and Planning of Hangzhou City (China) to study the planning of the Red River.

In this regard, Mr. Tien said, to this point, the city has not agreed to a foreign consulting unit involved in planning planning Red River urban areas.

To implement the master plan for the construction of the capital approved by the Prime Minister; Flood prevention planning and dike planning for the Red River and Thai Binh rivers were approved by the Prime Minister. The Hanoi People’s Committee has assigned the Hanoi Planning Institute to develop zoning plans for There is planning division of urban Red River (Planning along the Red River).

Based on the proposal of three investors including Sun Group Corporation, Vingroup Corporation, Hanoi General Import Export Joint Stock Company, the city approved the voluntary contribution of financial research for water treatment. , The planning of Hanoi Red River urban area has received the policy of receiving the support of the three above units, assigned Hanoi Institute of Construction planning in collaboration with 3 investors to choose the consulting units in and Outside the country are qualified, capable, experienced to study, give ideas, plans for project implementation.

Mr. Tien said that the Hanoi People’s Committee has instructed the Department of Planning – Architecture is the focal point in coordination with the Institute of Planning and Construction Hanoi and the relevant departments and agencies gather all the Relevant documents and information for the study and elaboration of master plans of Red river banks include: Planning, architecture and construction planning dossiers of the consultancy units previously studied Rescue related along the Red River; Information on hydrological indicators, dike length; Infrastructure, population on both sides of the Red River, land area; Assess the change of river water level after the hydropower system built upstream of Da river and Lo river in the recent time.

“The above indicators are publicly available, widely published in research topics, specialized materials and mass media, not related to the field of security and defense. . This information system will be used to serve the research consultants who will come up with the idea of ​​implementing the planning project, “Tien said.

According to Tien, Hanoi has set strict criteria and requirements to put ideas into practice. Specifically, the planning study along the Red River must follow the direction of ensuring flood prevention; Creating a modern city; Efficient use of land funds; Create land fund for the city to create resources for the implementation of the plan; Prioritize resettlement in place; Development of transportation and river transport; Study the plan of the route along the river and the dyke to prevent the flood.

“After the investors and consultants present the idea of ​​implementation of the planning project, the city will consider and select feasible ideas to meet the criteria and requirements. , Report to the competent authorities to allow the deployment of research project implementation, “Tien said.

Quốc Bình

 

Lam Dong province called for investment in 54 projects

(Construction) – In 2017, the People’s Committee of Lam Dong province lists 54 projects calling for investment in the area. Currently, Lam Dong has three national construction projects including 200.3km of Dau Giay – Lien Khuong expressway linking Dong Nai province to Lam Dong (currently implementing component 1 project: Dau Giay – Tan Phu ), In the form of BOT investment supported by the State; Restoring Da Lat – Thap Cham railway, upgrading Da Lat train station, Trai Mat, Dran for tourism. Lam Dong high-tech industrial park in Da Sar commune, Lac Duong district with the scale of 221.3ha (total investment capital of 91 million USD), the form of investment capital state budget and calling for investors .

 

About 51 provincial projects in 6 fields: science and technology; Investment in infrastructure and residential areas; Transportation; Agriculture; Tourism, services and commerce and industry, prominent as: Prenn Lake Resort; Nam Phuong I Lake Resort and Resort, Bao Loc Resort with 200ha; Residential construction – Southern Da Nhim administrative center in Lien Nghia Town, Duc Trong; Hi-tech agricultural production project in Don Duong district …

This is an opportunity for investors all over the country to participate in projects contributing to supporting the construction and economic development of Lam Dong province.

T.Huyền

Thai Nguyen: Investors continue to propose the adjustment of urban projects on the Cau River

(Construction) – On March 21 morning, Thai Nguyen People’s Committee held a meeting to inspect the progress of the construction project of the flood control system of Song Cau, combining the infrastructure of the two sides of Song Cau.

News from Thai Nguyen Portal (thainguyen.gov.vn): In the morning of March 21, Thai Nguyen People’s Committee held a meeting with the construction industry; Agriculture & Rural Development; Finance, Planning – Investment; Compensation Board; Thai Nguyen city and Phuc Loc group of investors to check the progress of the construction project of the flood control system of Song Cau, combining the infrastructure of the two sides of Song Cau.

At the conference, representatives of the consortium of investors of Phuc Loc Group reported a review of the volume of nine approved projects and proposed adjustments to the projects. Accordingly, the investor proposed: 13.9 km of new construction and embellishment of 2 km of the dyke of Song Cau river, Cau river was built from Gia Bay bridge to Ben Oanh bridge; To build 3 river wharves for river tours in upstream of Quang Vinh bridge, Gia Bay bridge and upstream of Thac Huong dam; Dredge 15.2 km, depth from 1.5-2m, expand river bed and open the Cau River flow from Cao Nien bridge to Thac Huong dam; Adjusting the width of the Huong Thuong bridge from 16m to 21m to ensure the walking margin on each side of the bridge 2.75m …

It is known that the joint venture of Phuc Loc Group Corporation – Traffic Engineering Construction Corporation No 8 (Cienco8) is the only investor who recently won a shortlist of a series of nine PPP projects implemented in accordance with BT in the province of Thai Nguyen, with a total investment of nearly 10,000 billion. These 9 projects are under the Project of Emergency Construction of the Cau River Flood Prevention System to combine the completion of urban infrastructure on both sides of Cau River, Thai Nguyen Province. And these projects have been urgently built by the PMU to bridge the Cau River flood control system to integrate the urban infrastructure system on both sides of Cau River, Thai Nguyen province. Up to now, investors are designing without the participation of functional departments.

PV